WISUNO
Bamboo; bamboo baskets for industrial purposes; bamboo curtains; bathroom furniture; bed bases; bed frames; beds; beds f...
Registry record checked
Trademark rights only
1. Non-metallic windows; 2. Railings (non-metal); 3. Armor windows with non-metallic frames; 4. Wooden window frames; 5. Non-metallic stairs; 6. Non-metallic shutters; 7. Non-metallic window frames; 8. Non-metallic door frames; 9. Non-metallic safety doors; 10. Non-metallic revolving doors; 11. Non-metallic fire-resistant building materials; 12. Non-metallic railings; 13. Non-metallic doors; 14. Artificial stone; 15. Waterproof coating [cement]; 16. Non-metallic ceilings; 17. Wooden flooring; 18. Tile flooring, non-metallic; 19. Non-metallic building materials; 20. Construction timber; 21. Construction wood boards; 22. Architectural stone; 23. Non-metallic casting molds; 24. Marble; 25. Cement boards
1. Non-metallic windows; 2. Railings (non-metal); 3. Armor windows with non-metallic frames; 4. Wooden window frames; 5. Non-metallic stairs; 6. Non-metallic shutters; 7. Non-metallic window frames; 8. Non-metallic door frames; 9. Non-metallic safety doors; 10. Non-metallic revolving doors; 11. Non-metallic fire-resistant building materials; 12. Non-metallic railings; 13. Non-metallic doors; 14. Artificial stone; 15. Waterproof coating [cement]; 16. Non-metallic ceilings; 17. Wooden flooring; 18. Tile flooring, non-metallic; 19. Non-metallic building materials; 20. Construction timber; 21. Construction wood boards; 22. Architectural stone; 23. Non-metallic casting molds; 24. Marble; 25. Cement boards
Category descriptions are summaries. Confirm the registered wording before purchase.
Confirm the following documents and transfer requirements with a qualified professional before purchase.
Confirm the asset, intended use, counterparties and proposed terms.
A qualified professional reviews the rights and transfer considerations.
Identify the exact rights, price, payee and conditions for completion.
Obtain the contractually required evidence and process payment accordingly.
Ownership, availability and the transfer agreement must be checked. Your purchase is not complete until the agreed transfer conditions are met.
Choose 20% upfront or full payment. The remaining balance is due after you approve the transfer agreement and before the agreed transfer step.
Bamboo; bamboo baskets for industrial purposes; bamboo curtains; bathroom furniture; bed bases; bed frames; beds; beds f...
Registry record checked
Trademark rights only
Baby bedding, namely swaddle bags, swaddle blankets, crib bumpers, fitted crib sheets, crib skirts, crib blankets, and n...
Registry record checked
Trademark rights only
Sports arm guards; fitness equipment; Christmas tree ornaments; doll clothing; dolls; elliptical machines; fitness balls...
Registry record checked
Trademark rights only